Week 9 Summary
3/5-3/9 Week: 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
ALL (NOTE that the information on this page is not always kept up to date. Check assignments pages for official due dates.)
Current TermMonday 5/30
Heard remaining #4 and #5. Work time on #6. Third EM topic presented. Quiz 3 assigned as due next Monday.
Tuesday 11/22
No Music 8 this quarter.
Wednesday 11/23
Work time on #6 assignments. Went over basics of final project, remaining schedule, etc.
Thursday 11/24
Thanksgiving Holiday
Friday 1/25
Thanksgiving Holiday
Previous Term2011 Winter
Monday 2/28
Introduced final project. Heard the few remaining #5 assignments. Work time on #6, which is due at next class. Assigned quiz 4 as due in one week. Reviewed the cycle, autopunch, and replace buttons. Went over schedule for remainder of the term. NEED TO intro time/pitch machine NEXT TIME.
Tuesday 3/1
Accepted, commented on, and returned class presentation proposals. That that require revision and resubmission must be returned at next class meeting. Presentation schedule is posted. Went over the final project, including a reminder about date and time. Work time on assignment #7 - originally due today but most were not finished. Must hear it at next session.
Wednesday 3/2
Heard only a VERY few assignment 6. Final project requirements are now fully disclosed - students know deadline for playback and the necessity of starting soon and working efficiently to finish it. Went over the time/pitch machine.
NEXT time: must present remaining topic and assign quiz 4.
Thursday 3/3
Plan: Hear #7. Finalize presentation schedule and proposed topics. Work time on final project.
Friday 3/4
Reminder of need to enroll in Intermediate Electronic music this coming quarter since, best case, it will not be offered again until winter term of 2012, and if we must eliminate additional sections it is possible that it might not be back until spring 2012!
15 minutes of work time on quiz 4 to finish it up, followed by quiz review. 45 minutes work time on #6 before grading it. Introduce the final history topic and clarify that quiz 3 is due at start of period next week. Go over final project requirements and the details of our remaining schedule.
2010 Fall
Monday 11/15
Work time on #6, which is due at next class. Test #1.
Tuesday 11/16
Mostly
work time on #7, which is due at next class. Still some #6 work to see.
Went over final project and schedule for remainder of the term.
Wednesday
11/17
A few people showed up who had missed test
#1 on Monday! I let them take it today. Much of the period was spent
working on #6 which was due today - but many were not done. Went over a
few additional editing techniques for matching samples to time. Did NOT
do the third EM topic this week - Must do this on Monday. Must assign
BOTH REMAINING QUIZZES that day, likely due the following Monday, though
Wednesday would also be possible. Introduced the final project format
and reviewed the rough outline of our calendar for the remainder of the
term.
Thursday 11/18
Reviewed
final project stuff, reminded about need to submit required revisions
to presentation proposals, projected the presentation schedule, reviewed
class schedule for remainder of term including date/time for final exam
session. Heard #7 - a number probably still need to be reviewed.
Friday 11/19
Second-to-last regular class meeting! Lots to do!
Went
over remaining schedule: this class, two weeks from today (last regular
class), then final exam session. Quizzes 3 and 4 due at start of period
next week. We'll do test 2 at end of final exam session. Next session
devoted almost entirely to work on final project - exception being quiz
review. Did third EM history topic.
Heard all pre-6 assignments
but decided to NOT hear #6 today so that no time would be taken away
from getting started on the final project. MUST hear #6 at the final
class session in two weeks! Also at that session, probably give people
about 15 minutes at the start of the period in case they need to use the
Logic program to review material for quiz 4 questions.
2010 Spring
Monday 5/31
Memorial Holiday - campus closed
Tuesday
6/1
Mostly work time on #7, which is due at next
class. Still some #6 work to see. Went over final project and schedule
for remainder of the term.
Wednesday
6/2
Heard many remaining #6 projects - some may
still need to be heard. Introduced the final project format and
reviewed the rough outline of our calendar for the remainder of the
term. Also heard a few remaining #5 assignments.
Did not do the
third EM history topic - do next time with quiz due at the following
class meeting. Also need to assign quiz 4 soon.
Thursday
6/3
Reviewed final project stuff, reminded about
need to submit required revisions to presentation proposals, projected
the presentation schedule, reviewed class schedule for remainder of term
including date/time for final exam session. Heard #7 - a number
probably still need to be reviewed.
Friday
6/4
Reviewed schedule
for remainder of term. Heard #6 (some may still need to be reviewed next
week.) Went over final project requirements. Reviewed take-home quiz 3.
Assigned quiz 4 as due at start of next class. Announced test 2 for
last regular class meeting. Introduced Logic material for quiz 4. Much
of the period was work time on #6 and, for those who finished #6, on the
final project.
2010 Winter
Monday 3/1
I was out sick.
Tuesday
11/17
Class met for a work session but I did
not introduce anything or hear projects since I was still sick.
Wednesday
11/18
Catch up after the missing day.
Thursday
11/19
Work time on final project. Accepted
final revisions to class presentations. (Many students were out for the "day of action" stuff)
Friday
11/20
Announced change
to test 2 date - to final exam session. Collected and reviewed quiz 3.
Assigned quiz 4 for next week. (May allow 15 minutes at start of
period.) Work time to finish #6. Went over final project requirements
and some started on it.
2009 Fall
Monday 11/16
Hold off on hearing #6
until Wednesday. Described final project and reviewed deadline. Returned
quizzes 1 and 2 and quickly re-reviewed them. Some work time on #6 or
final project. Test 1 during last 45 minutes of period.
Tuesday
11/17
Mostly work time #7. Introduced the final
project assignment. Accepted presentation proposals, returned with
comments - and in some cases a request for revisions by Thursday. Posted
the presentation schedule. Did NOT hear #7 yet since only two students
were finished - will hear at start of class on Thursday.
Wednesday
11/18
Hear remaining project 6. Announced the
final project and the schedule for the remainder of the term. Thursday
11/19
Work time on final project. Finalized
topics and posted schedule.
Friday
11/20
Hectic class due
to the two November holidays. Started with review of quiz 4. Then work
time on project 6, along with explanation of final project and work time
on that. In the end I did NOT get to hear #6, as there was too much
else to do - will need to hear it during last class meeting. Introduced
new material on EM history for quiz 3, which is due at start of period
at next class. Also introduced autopunch/replace/cycle in Logic.
Announced planned schedule for next class: Accept and review quiz 3,
work time on final project, hear #6, test in last 45 minutes of that
class.
---
Monday 3/2
Primarily
work time on #6.
Heard the few remaining #5 projects. Announced next quiz (#4 ahead of
#3). Heard some #6 projects - it was due today, surprisingly - and will
hear others on Wednesday. On Wednesday, two options include the EM
history topic and starting work on the final project - or both.
Tuesday 3/3
Mostly
work time #7. Introduced the final project assignment. Accepted
presentation proposals, returned with comments - and in some cases a
request for revisions by Thursday. Posted the presentation schedule.
Did NOT hear #7 yet since only two students were finished - will hear
at start of class on Thursday.
Wednesday 3/4
Hear
remaining project 6. Announced the final project and the schedule for
the remainder of the term. Thursday 3/5
Work time on final project.
Friday 3/6
Note
that some significant adjustments had to me to the schedule of events
in order to complete #6 today and move on to the final project.
Reviewed
quiz #4. Announced change to #3 - I will present next week and it will
be due the following week, the same day as test #2. I heard remaining
#5 projects. Did NOT do the EM history topic today. Did NOT cover
drop/cycle (as on quiz #4). Will do both next time.
--- Monday 11/17
Primarily work time on #6. Tuesday 11/18
Mostly
work time on first rewire assignment. Introduced External tracks to
record MIDI control of Reason instruments. A lot of individual work
time. Will not do 6a/7 this term, but will incorporate these techniques
into final project this term. Individual troubleshooting. Outlined the
final project briefly. NEED TO: do detailed description of final
project, hear the rewire project, return the proposals and schedule
them. Wednesday
11/19
Today: DID NOT hear #6.
Discuss final project. EM topic #3 and announce quiz 3. (Still need to
review/introduce loop/overdub/punch recording techniques.) Thursday 11/20
Briefly
demonstrated the process of turning any sample into a sound for a NNXT
or NN19 instrument. Stated that this (assignment 7) would not be a
separate project this quarter, but would instead be incorporated into
the final project, with assignment 7 credit for doing this. AGAIN did
not hear 6 - will hear at start of period on TUESDAY. Announced
presentation schedule - which begins on TUESDAY. Friday 11/21
TALK
ABOUT REMAINING SCHEDULE! Collect and review quiz 3. Review the steps
to download, save, import, and edit an audio file. Review steps to
backup files on server and on memory stick. Go over final project
requirements. Assign quiz 4. Go over drop and cycle and the transport
window generally.
Week: 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
ALL (NOTE that the information on this page is not always kept up to date. Check assignments pages for official due dates.)
|
|