Week 6 Summary
2/13-2/16 Week: 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
ALL (NOTE that the information on this page is not always kept up to date. Check assignments pages for official due dates.)
---
Current TermMonday 10/31
Heard a few last #3 assignments. Students who have not shown this yet must let me know when done. Did 2nd EM topic. Announce quiz #1 #2, and test 1. Work time on #4, which is due at next Monday's class session.
Tuesday 11/1
No 8 this quarter
Wednesday 11/2
Collected first quiz and reviewed. Work time on currently due project #4. Will delay playback of #4 until Monday's class. Announced due date for #5 as next Wednesday. Announced test 1 date one week after that.
Introduced global tracks. Went over ES1 editing for the next assignment - did basics of octave, oscillators, filter - did not do ADSR.
(Future/next topics to do? Should also cover quantizing and loop recording in a more methodical manner. Also: recording mixer automation.) Thursday 11/3
No 8 this quarter
Friday 5/13
We are accelerating the schedule this week since there are two fall term holidays, including one next Friday. Today we reviewed quizzes #1 and #2, both of which were due today. Test #1 is at the end of the period. Work time on #4, which is due later in the period. Introduce basic ES 1 editing techniques for assignment #5, which students may start today. Will need some work time on it at next meeting in two weeks, since it will be due later in the period that day.
Previous Terms2011 Spring Monday 5/9
Went over ES1 editing for the next assignment. Work time on #4, which is due at next class session. Introduced global tracks. Next time: second electronic music topic. Announce date for test 1 Tuesday 5/10
Went
over quiz 2. NEGLECTED TO SET TEST DATE - DO THIS NEXT TIME. Heard
remaining assignment #4. Introduced the basics of Rewire, including how
to rewire the Reason Mixer or individual Reason instruments into Logic.
Did not do the External MIDI aspect of this yet - for next time? Did
not yet assign the deadline for submitting proposals - perhaps do that
before that start of Thursday's class? The rest of the period was work
time on the NNXT/NN19/Matrix assignment that is due next meeting. Wednesday 5/11
Collected
first quiz and reviewed. Work time on currently due project #4. Will
delay playback of #4 until the start on next Monday's class. Announced
due date for #5 as next Wednesday. Announced test 1 date one week after
that. Did second EM history topic. (Future/next
topics to do? Should also cover quantizing and loop recording in a more
methodical manner. Also: recording mixer automation.) Thursday 5/12
Changed
course just a bit today. Did second rewire session in which we create
arrange tracks in logic that hold midi data for reason instruments. The
assignment based on this is due next Thursday Introduced
the class presentation assignment and explained roughly how it works.
Set deadline for proposals as two weeks from today. (Will need to check
in on progress sometime during next week's class - likely on Thursday.)
Posted and announced the date of test #2 - see quiz schedule. Delayed
deadline for #5 - which had been today - until the first half of next
Tuesday's class. (Note: It is quite possible that having #6 finished by
next Thursday may be too aggressive of a schedule.) Friday 5/13
Not this term
2011 Winter Monday 2/7
Reviewed quiz 1. Changed deadline for next assignment (4) from end of today to middle of next session. (At next session, start with new material for next assignment - e .g sound editing of logic basics - follow with 45 minutes work time on #4, etc.) Introduced second electronic music topic - BUT DID NOT PLAY VARESE YET.
Announced: Quiz 2 due next Monday Test 1 the next class session after that on Wednesday
Tuesday 2/8
Mentioned the date of the test in a week and that it covers the two quizzes. Handed back the quizzes. Introduced the basic idea of the presentation assignment and talked a bit about selecting topics. Did not yet assign the deadline for submitting proposals - perhaps do that before that start of Thursday's class? The rest of the period was work time on the NNXT/NN19/Matrix assignment that is due next. At the end of the period it seemed like a few were done, but certainly not all. Likely will need some time for this at next class. Also at next class, probably time to start introducing material for next assignment using Rewire - perhaps near start of period for those finished with current assignment and ready to go on.
Wednesday 2/9
Introduced the basic methods of modifying/creating sound on the ES1 as required for assignment 5. DID NOT ANNOUNCE DEADLINE FOR ASSIGNMENT 5 YET - it will likely be the first session after the break.
DID NOT hear #4 after all. Only perhaps a half dozen students were finished. MUST hear them near start of next period - no more work time - play them in whatever form they are in.
(Future/next topics
to do? Should also cover quantizing and loop recording in a more
methodical manner. Also: recording mixer automation.) Thursday
2/10
Changed course just a bit today. Introduced the use of Rewire to interconnect Reason and Logic. Covered all three aspects in at least a basic way: connecting mixer audio from Reason into Logic Mixer, connecting individual instrument to Logic Mixer, and creating external MIDI tracks in Logic. Because of this, did not hear #5 at end of period. Will do this at start of class on Tuesday.
Friday 2/11
Review quiz #2. Grade and return quizzes #1 and #2. Work time on #5 (and for some #4). Test 1 after break. More work time on #5. Introduction to Logic audio editing for #6 - may need to return to this since today's intro was very basic and brief. Hear remaining #4 and #5.
Fall 2010
Monday 10/25
Reminder about quiz #1 due
at next class. (Need to do next topic, schedule quiz and test 1.) Did a
very quick introduction to sound editing on the ES1, including how to
save an instrument. Heard assignment 3. Reminder about assignment 4.
Introduced the ES1 editing needed for assignment 5. (Might need to make
brief mention of editing on EFM 1 next time?)
Tuesday 10/26
Heard
all remaining current project (4?). Went over an example of how to
construct a pitched sample instrument from individual samples. Did early
introduction of the class presentation project - mostly just to get
students thinking about it. Next project due soon.
Wednesday 10/27
Reviewed
first quiz after turning it in. Did NOT do next topic yet - will do
that next time. (Going a bit slow since we are ahead of the Friday
class.) Introduced the EFM1 and went over requirements for #4 and #5.
Decided to wait until Monday to hear #4 - close to the start of the
period.
Next time must do second electronic music history topic
and quiz 2 for next class. Good idea to also set and announce date for
test 1.
(Future/next topics
to do? Should also cover quantizing and loop recording in a more
methodical manner. Also: recording mixer automation.) Thursday
10/28
Did a very basic introduction to the class
presentation assignment, but did not yet assign a due date for
presentation proposals - this was more about getting people thinking
about the presentations. Need to assign proposals at the next class -
due the following week.
Went further into Rewire - mapped
separate Reason instruments directly through the hardware interface and
then individually into Logic tracks. Have not yet made the assignment
for #6 - need to start the period next Tuesday with this.
Friday
10/29
Largely same as MW, with deadlines, etc. as listed.
Tentative plan as of start of class: 1. review quiz - OK 2. hear #4 - Only fewer than half dozen done - now at start of next class - those who need more time MUST use MW class lab time. 3. quick review of editing ES1 and add EFM1 - OK 4. Announce goal of quick work on #5 to finish at middle of next period - sacrifice recorded tracks to get there? - OK 5. 2nd topic and announce quiz. - OK 6. Test 1 at end of next class? - OK 7. loop recording? - NO...
Next time: Hear 5 at middle of period. 6 due at start of class after that. test next time. intro audio editing next time. Spring 2010
Monday 5/10
Reviewed quiz #1. Mentioned
that coverage of next quiz topic would be on Wednesday, with due date
for next quiz to be Monday, May 17. (Test could be 5/19 or 5/24.) Did a
very quick introduction to sound editing on the ES1, including how to
save an instrument. Heard assignment 4.
Tuesday 5/11
Heard
all remaining current project (4?). Went over an example of how to
construct a pitched sample instrument from individual samples. Did early
introduction of the class presentation project - mostly just to get
students thinking about it. Next project due soon.
Wednesday 5/12
Did
second electronic music history topic. Assigned quiz 2 for next class.
Did a quick review of how to edit and save ES1 and EFM1 instruments.
Heard some remaining #4 projects
(automation and effects). Covered the ES1 sufficiently for project #5,
which is due at the end of class next Wednesday.
(topics
to do? Should also cover quantizing and loop recording in a more
methodical manner. Also: recording mixer automation.) Thursday
5/13
Did a very basic introduction to the class
presentation assignment, but did not yet assign a due date for
presentation proposals - this was more about getting people thinking
about the presentations. Need to assign proposals at the next class -
due the following week.
Went further into Rewire - mapped
separate Reason instruments directly through the hardware interface and
then individually into Logic tracks. Have not yet made the assignment
for #6 - need to start the period next Tuesday with this.
Friday
5/14
Largely same as MW, with deadlines, etc. as listed.
Winter 2010
Monday 2/8
Heard about half of the next
assignment - the rest to be heard in class on Wednesday.
Collected/reviewed first quiz. Next topic at Wednesday class, followed
by quiz 2 due date a week later (given the Monday holiday) and test
after that as indicated on quizzes page. Did VERY quick and cursory
intro to editing the ES1, though no more than pointing out that there
are control and where to find them, and how to save an instrument.
Tuesday
2/9
Project 5 due today -
heard almost all but
there are still a few to hear at the next class. (Project semi-due in
the next week or so.) Did the very basic intro to Rewire, including how
to start the programs and how to set up a channel strip in the Logic
mixer and how to create an audio track in Logic for automation.
Wednesday
2/10
Heard some remaining #4 projects
(automation and effects). Covered the ES1 sufficiently for project #5,
which is due at the end of class next Wednesday. Did second EM history
topic and assigned quiz 2 as due next Wednesday - next class meeting.
(topics
to do? Should also cover quantizing and loop recording in a more
methodical manner. Also: recording mixer automation.) Thursday
2/11
Did a very basic introduction to the class
presentation assignment, but did not yet assign a due date for
presentation proposals - this was more about getting people thinking
about the presentations. Need to assign proposals at the next class -
due the following week.
Went further into Rewire - mapped
separate Reason instruments directly through the hardware interface and
then individually into Logic tracks. Have not yet made the assignment
for #6 - need to start the period next Tuesday with this.
Friday
10/30
No class due to
Presidents Day holiday
Fall 2009
Monday 10/26
Will present the first EM
topic next time with quiz to follow at Monday class and then first test
very soon thereafter - also need to do the second topic as soon as next
Monday. Work time on #4 with projects due at end of period. Did VERY
quick and cursory intro to editing the ES1, though no more than pointing
out that there are control and where to find them, and how to save an
instrument. In order to stay on track with Friday class (which moves
ahead now, but falls back later) need to do the intro to editing the ES1
very soon.
Tuesday
10/26
After
hearing the last of #4 we had some work time on project 5 which is now
due at the END of the period next class. Introduced the use of the
NN19, both to bring in pre-set sample instruments and to build an
instrument from individual samples. Still did not assign the quiz! Need
to do that and perhaps demo the NN-XT next time - though one or both
could wait a session if time is needed for work on #5. (Save for
later: basic introduction to Rewire - stereo audio from Reason into
the Logic mixer and then individual instruments from Reason into
separate Logic tracks/channel strips.)
Wednesday
10/28
Heard some remaining #4 projects
(automation and effects). Covered the ES1 sufficiently for project #5,
which is due at the end of class next Monday. Did not do the EM history
session yet - intentionally delayed it until next Monday... but really
need to do it then. Will need work time on #5 on Monday, and could delay
deadline until start of Wednesday class if necessary to do EM history.
Should
also cover quantizing and loop recording in a more methodical manner.
Also: recording mixer automation, possibly automation of values other
than pan/volume. Thursday
10/29
Project
6 is next week - maybe... I did not announce it or go over required
techniques yet. Need to do this next week on Tuesday. (STILL NEED TO DO
THE QUIZ.) DID: introduce the NN-XT. How to do layers, including
velocity layers. Heard #5 from most students but a few need to be
checked next Tuesday. Introduced the CV Splitter/merger, mostly in the
context of splitting. Very briefly pointed out the existence of the
audio equivalent module. Only checked a couple #1 assignments. Need to
follow up on this next time.
(Did not yet do the basic
introduction to Rewire. Rewired audio from Reason into the Mixer in
Logic - from the Reason Mixer (stereo) and from the Reason Interface
(individual channel per instrument).
Friday
10/30
Reviewed Quiz #1 at start of period. Did a
brief overview of the EFM 1. Went over the ADSR on the ES 1. Introduced
imported audio - but only basics: download from sampleswap.org, import
audio to track - did not look at audio editor at all. Need to finish
into to using audio samples in Logic next week and assign #6 as due at
following session. Should probably assign the Logic quiz next week for
due date at class after that, leaving one more topic preso for later.
(For assign 6 which will likely be due not next week but the following
class session.) Did EM topic two and assigned quiz. Announced quiz due
at start of next class and Test #1 at end of same session.
Monday 5/11
Presented the second EM
history topic, assigned quiz due Wednesday, announced test for one week
from today. Work time on #4 with projects due at end of period... but
fewer than half of the students had completed it - so remaining
students can play it back at the start of the period on Wednesday.
(Before?/After? the quiz is reviewed?)
Tuesday 5/12
Primarily
work time on project 5 which is now due at the start of the period next
class. Reviewed harmonics and frequency modulation sidebands for the
take-home quiz that is due at the start of the period on Thursday. Did
a quick introduction to the NNXT, demonstrating how to load instruments
and samples, how to create a simple layer, and the basic concept of
velocity layers. (Save for later: Did the basic introduction to Rewire
- brought stereo audio from Reason into the Logic mixer and then
brought individual instruments from Reason into separate Logic
tracks/channel strips.)
Wednesday 5/13
Collected
and reviewed quiz 2. Announced that test 1 will be one week from today
on Monday. Introduced the editing of plugin synths in Logic - used the
ES1 Subtractive Synth mostly, but also a bit of EFM, ESX24, and
Ultrabeat - and how to save settings for later use. Heard assignment 4.
Made assignment 5. (Next class will also largely be a work session on
assignment 5 - though perhaps return the two quizzes at the beginning
and do the test at the end!) (Still need to perhaps take a closer look
at the mixer, including how to record automation directly from the
mixer controls. Perhaps need to take a quick look at editing the EFM 1
synth.) (Question: Did we cover the automation of plug-in controls in
this class?)
Thursday 5/14
Project 6
is next week. Did the basic introduction to Rewire. Rewired audio from
Reason into the Mixer in Logic - from the Reason Mixer (stereo) and
from the Reason Interface (individual channel per instrument).
Demonstrated how to add a track in the Arrange window for each input
from Reason. Did NOT describe assignment 6 - must do that next time.
Friday 5/15
Review
quiz 2 at start of period. Then heard playback of all remaining project
4. Introduce editing techniques for assignment 5* and provide some work
time on it - need to specify deadline (start or end of the following
week?). Test 1 during final 45 minutes of period - students who
complete test early may work on #5. *This included a decent exploration
of the ES1, a short intro to EFM, and very brief look at EXS24 and
Ultrabeat.
Monday
2/9
BWork time on project 4
(deadline now end of Wednesday class). EM History 2 topics. Quiz 2 due
Wednesday. Announced test #1 for a week from Wednesday.
Tuesday 2/10
Primarily
work time on project 5 which is now due at the start of the period next
class. Did the basic introduction to Rewire - brought stereo audio from
Reason into the Logic mixer and then brought individual instruments
from Reason into separate Logic tracks/channel strips.
Wednesday 2/11
Collected
and reviewed quiz 2. Announced that test 1 will be one week from today
on Wednesday. Introduced the editing of plugin synths in Logic - used
the ES1 Subtractive Synth only - and how to save settings for later
use. DID NOT HEAR ASSIGNMENT 4 AGAIN - MUST DO THIS AT START OF NEXT
CLASS. (Next class will also largely be a work session on assignment
5.) (Still need to perhaps take a closer look at the mixer, including
how to record automation directly from the mixer controls. Perhaps need
to take a quick look at editing the EFM 1 synth.) (Question: Did we
cover the automation of plug-in controls in this class?)
Thursday 2/12
Project 5
is due today. Did a very, very basic introduction to Logic and went
over a few basics regarding sample instrument design on the NNXT. Friday 2/13 General
plan for 5/15/09: Collect and review quiz 2 at start of period. Then
hear playback of all remaining project 4. Introduce editing techniques
for assignment 5 and provide some work time on it - need to specify
deadline (start or end of the following week?). Test 1 during final 45
minutes of period - students who complete test early may work on #5.
---
Monday 2/9
BWork time on project 4
(deadline now end of Wednesday class). EM History 2 topics. Quiz 2 due
Wednesday. Announced test #1 for a week from Wednesday.
Tuesday 2/10
Primarily
work time on project 5 which is now due at the start of the period next
class. Did the basic introduction to Rewire - brought stereo audio from
Reason into the Logic mixer and then brought individual instruments
from Reason into separate Logic tracks/channel strips.
Wednesday 2/11
Collected
and reviewed quiz 2. Announced that test 1 will be one week from today
on Wednesday. Introduced the editing of plugin synths in Logic - used
the ES1 Subtractive Synth only - and how to save settings for later
use. DID NOT HEAR ASSIGNMENT 4 AGAIN - MUST DO THIS AT START OF NEXT
CLASS. (Next class will also largely be a work session on assignment
5.) (Still need to perhaps take a closer look at the mixer, including
how to record automation directly from the mixer controls. Perhaps need
to take a quick look at editing the EFM 1 synth.) (Question: Did we
cover the automation of plug-in controls in this class?)
Thursday 2/12
Project 5
is due today. Did a very, very basic introduction to Logic and went
over a few basics regarding sample instrument design on the NNXT. Friday 2/13
NO CLASS - HOLIDAY
Monday 10/27
Briefly introduced method
of doing a master volume fade via "read" mode on the output 1-2 fader.
Work time on project 4 (deadline now delayed until start of Wednesday
class). EM History 2 topics. Quiz 2 due Wednesday. Announced test of
next Wednesday, November 5.Heard some assignment 3 examples -
need to hear remaining on Wednesday. Collected and reviewed quiz 2 in
prep for test on 2/19. Introduced the basics of the Track mixer, gave
an overview of plug-in synth modules. Work time on next project. Tuesday 10/28
Primarily
work time on project 5 which is due at the start of the period next
class. Mentioned that it is possible to bring in audio samples from
instruments besides the NN19, the Dr. Rex sounds for example. (Still
need to give an introduction/overview on the CV mixer/merger. Still
need to do an organized presentation on the NNXT.) Wednesday 10/29
Collected
and reviewed quiz 2. Announced that test 1 will be one week from today
on Wednesday. Introduced the editing of plugin synths in Logic - used
the ES1 Subtractive Synth only - and how to save settings for later
use. DID NOT HEAR ASSIGNMENT 4 AGAIN - MUST DO THIS AT START OF NEXT
CLASS. (Next class will also largely be a work session on assignment
5.) (Still need to perhaps take a closer look at the mixer, including
how to record automation directly from the mixer controls. Perhaps need
to take a quick look at editing the EFM 1 synth.) (Question: Did we
cover the automation of plug-in controls in this class?)
Thursday 10/30
Project 5
is due today. Did a very, very basic introduction to Logic and went
over a few basics regarding sample instrument design on the NNXT. Friday 10/31
Quiz due, etc. Assignment 4 due near
start of class - heard all but perhaps 1 or two students. Topics:
Bounce Tracks to MP3, editing plug in synths, master volume automation,
automating other parameters on plugins. etc.. Next week: Work time for
assignment 5, test #1, hear #5 at end of period. If possible move ahead
a bit more in anticipation of upcoming Friday holiday
Week: 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
ALL (NOTE that the information on this page is not always kept up to date. Check assignments pages for official due dates.)
|